dieter says: "A-107, A-149-1, A-133, A-167, A-172 and A-196 are in production at our manufacturer. The estimated shipment date from our manufacturer is Nov. 04, 2003. The prototype boards of A-101-1, A-137 (second version), A-149-2 and A-197 VU are ordered. I hope we recieve the pcbs next week and will start to assemble them asap. The A-149-2 is very important as we want to prepare even the first A-149-1 so that the optional A-149-2 module can be added later simply by connecting the 2 boards without any modifications at the A-149-1. If the A-149-2 prototype board arrive next week this should work. At the moment we start our investigations for A-101-3 Modular Phaser and A-101-2 Lowpass Gate (similar to Buchla's but probably with additional Resonance control), These modules will be manufactured early in 2004. For the A-101-3 phaser we will manufacture the module in any case but the details still have to be puzzled out (e.g. which in/outputs as sockets, how many polarizer, one or two phase shift controllers ....). And of course we will finish the A-154 and some time the TKB. Best wishes Dieter Doepfer P.S. We updated the A-101-3 Phaser Info a few minutes ago." ===== Bakis Sirros Parallel Worlds / Polariton Athens-Greece [Doepfer_a100] group owner http://www.rubber.gr http://www.ward12.com __________________________________ Do you Yahoo!? The New Yahoo! Shopping - with improved product search http://shopping.yahoo.com
Message
latest info about the forthcoming modules from doepfer.
2003-10-22 by Bakis Sirros
Attachments
- No local attachments were found for this message.