Yahoo Groups archive

Doepfer

Index last updated: 2026-04-29 00:15 UTC

Message

Re: [Doepfer_a100] Re: A-110 VCO calibration

2005-08-10 by Florian Anwander

Hi


>>The full set-up procedure is in the A-110 Service Manual, which is 
>>available at the Doepfer website (there's a link on the A-110 page).
> Hmm... thanks but not very helpful, I do not wish to carry 
> out such a procedure, as I may make the matter worse with
> the VCO.
Then you heave to bring it to a shop, who gives service for Doepfer.

Nevertheless it sould be quite easy:
- switch off the A100 system
- remove the screws from the A110
- do NOT disconnect the power of the A110,
- cover the soldering side of the A110 with a piece of paper; you
   may fix it simply with an adhesive tape (This prevents unwanted
   shortages, though it is quite diffcult to destroy really
   something)
- switch on the A100 and let it warm up a quarter of an hour.
- set the "Tune" poti to center position.
- take a small screw driver and tune the VCO with the trimmer "P6"
   (it is placed direct aside the writing "DOEPFER A110" on the pcb).
- DO NOT TOUCH ANY OTHER TRIMMER!
- switch off the A100
- remove the shielding paper on the A110's back
- fix the A110 with the screws in the frame

Best regards, Florian

Attachments

Move to quarantaine

This moves the raw source file on disk only. The archive index is not changed automatically, so you still need to run a manual refresh afterward.