Hi all. Well I managed to get a translation of the process. Here is what I have received. I do not know how good the translation is but here it is. Trev Through Holes production process 1. Nickel-plated agent modulation 2. Glue fixing straps Tools Etching Tank x 1 Thermometer x 1 Heating Pipe x 1 Nickle-plated agent x 2 Fixing straps x 4 Double sided tape x 4 1. Nickel-plated agent modulation Hold the etching tank with 1 hand and bottle with the other Pour the chemical slowly (from sideway) into tank - to avoid spatter When nearly done, change to the normal direction & pour in the remaining Put the heating pipe into tank (centre) and afixed it to the side Heating pipe set at approx. 55 degree celcius (50 - 60 degree celcius) Then plug in the thermometer & oxygen tube Note - put the standby power supply before putting the heating pipe power on Stick the double side tape onto fixing straps First step - Anti-plating Purpose - to apply a layer of anti-plating coating on electronic board a. Unstrap the double-sided tape paper on fixing strap b. Stick it onto blank paper c. put the electronic board next to the fixing straps d. unstrap the other double sided tape paper on fixing strap e. stick it on the next to the electronic board Note - Please do not touch the board surface with hand f. Use anti-plating pen and smear over (from left to right) the board g. Gently & intermedia speed, in order the whole board is coated with the anti-plating h. Needs to apply each coating strap 3 times i. There is some overlapping between first and second strap, so on and so fort Note - Please do not touch the board surface until the coating is 100% dried up j. Use hair dyer to dry the coating, without touching the board surface, takes about 3 mins k. Take another piece of blank paper and 2 fixing straps, repeat the same for the other side of the board l. Repeat the coating on the other side of the board m. Repeat the drying process Second Step - Drilling Note - MUST use the PCB specialise Tungsten/ Wolfram steel drilling needle Chemical Process First step - Surface treatment Purpose - Clean the holes to enhance the plating effect Time - 3mins (2-4mins) a. Put 2-3cc surface treatment agent onto board b. Use brush to apply the agent all over the board surface c. Use fingers to press on board, make sure liquid has get thru all holes d. repeat the above for about 3mins, to make sure liquid has get thru all holes thoroughly e. Clean brush, container and board with water f. Fling the brush, container and board till dry Second Step - Activation Purpose - To coat the board surface and inner holes with activator agent Time - 3mins (2-4mins) a. Put 1-2cc activator agent onto board b. Use brush to apply the agent all over the board surface c. Use fingers to press on board, make sure liquid has get thru all holes d. repeat the above for about 3mins, to make sure liquid has get thru all holes thoroughly e. Clean brush, container and board with water f. Fling the brush, container and board till dry Step Three - Coat stripping Purpose - To clear out anti-plating coating Time - 3mins (2-4mins) a. Put 2-3cc coat stripping agent onto board b. Use brush to apply the agent all over the board surface c. Use fingers to press on board, make sure liquid has get thru all holes d. repeat the above for about 3mins, to make sure liquid has get thru all holes thoroughly e. Clean brush, container and board with water f. Fling the brush, container and board till dry Step Four - Pre-plating Treatment Purpose - Copper Foil pre-plating treatment Time - 3mins (2-4mins) a. Put 2-3cc pre-plating treatment agent onto board, this would change the colour of copper foil if it is working b. Use brush to apply the agent all over the board surface c. Use fingers to press on board, make sure liquid has get thru all holes d. repeat the above for about 3mins, to make sure liquid has get thru all holes thoroughly e. Clean brush, container and board with water f. Fling the brush, container and board till dry g. If unable to place the board into etching tank within the next 20 second, please soak the board in container filled with water, to avoid contact to the air Step Five - Nickel Plating Purpose - to plate electric conductive metal onto holes and copper foil Time - approx 30min to an hour (the longer time, the thicker coat) a. When temperature reaches 55 degree celcius, put the board into etching tank (filled up with nickel-plated agent) b. Needs approx. 30mins c. Should have tiny bubble raising in the nickel-plated agent d. Upon completion, u are able to see holes are coated with nickel.
Message
Re: ¿Kinsten electroless through hole plating?
2008-11-19 by trevwhite74
Attachments
- No local attachments were found for this message.