A friend looked at my pictures of my failed etchings and suggested I lower my UV light and greatly extend the exposure time. I went from 7" down to 2.5" and from 1 minute to 8 minutes. HUGE improvement. My first test piece was done etching in 9 minutes with the ferric chloride at about 75F. The second test piece used the same set up and chemicals but the acid sat out in the Arizona sun for about 15 minutes so must have warmed up. It etched in 5.5 minutes. My next test cycle will be with all the same except I will try using convection etching. Rick [Non-text portions of this message have been removed]
Message
success!
2012-11-23 by Rick Sparber
Attachments
- No local attachments were found for this message.