> c) Now that the initial Frac shipment is completed, attention turns back to > assembled module shipping. The non-prestuffed MOTM-480 kits will be ready to go > by Friday, too. I now have a LOT of stock for all the power supply "stuff" > (906s, 990s, etc) so those of you waiting for power supplies will get shipped > this week. Indiana is about 100% "stocking levels" (about 100 kits sitting on > the shelf). All that is a hassle are the Tempco resistors, still about 14 days > away from getting those unless they ship early. So I read it this way: My nearly 3 year old points-only order of 310 and 950 will ship very very very soon. Do I have that right? John Speth (whose patience is running out).
Message
Re: Update
2006-05-15 by John Speth
Attachments
- No local attachments were found for this message.