The MOTM 'work week' is about over. Despite the 11 *inches* of rain (thankfully today was just a drizzle) a lot got done. All of the outstanding MOTM-310 and MOTM-510 kits are built up and will start shipping next week. I sweet-talked my old tech Shane to put in some time soldering up all of MOTM-830 Mixer assembled backlog, so that module is at least caught up. I built 22 Frac modules and those are shipping tomorrow to Analog Haven. The one thing I didn't get to this week but will this coming week is all of the power supply backlog shipped out. About the Stooge cables: another person has agreed to handle this and so I will forward him all of the previous requests. That deal is now between him and the Hanebergs and I am no longer involved. I'll let him "announce" it when he wants to. The next three weeks will be more "real work" than MOTM. I am still on track to ship over 100 modules in July and another 100 in August which would get me 100% caught up. I think the single biggest chore is building about 15 assembled MOTM-510s but that pcb goes pretty smoothly and shouldn't take that much total time. Paul S.
Message
Update
2007-07-07 by Paul Schreiber
Attachments
- No local attachments were found for this message.