a) MOTM-650s are at SMT assembly house getting stuffed b) MOTM-730: all parts/boards now in-house, will send to SMT assembly after the '650s are done (plus they are moving to a larger location, so I expect this will be 1st week of Sept). Front panels on order. Still looking good for Oct 15th ship date. They are in the cart, get yours on order today! Operators standing by. c) MOTM-1800 and MOTM-1485 Fracs will ship to AH on Sept 5th. d) Will ship over 60 MOTM modules (kits + assembled) by Sept 8th. This is 1/3 of existing backlog but it's a dent. My 'day job' has had much travel this summer, nothing I can do about that. But with the 4-day holiday weekend coming up I have blocked that time for lots of MOTM activity, have hired part-time help (for putting together '650s). e) after I get the 60 modules shipped I will devote some time to CG/CGX production hardware. I can't let the Livewire AFG get all the attention/fun :) f) several folks have asked about additional Frac modules (like a '440). If you want to see such modules, lobby Shawn at Analog Haven. He decides, not me. g) there are several modules here for repair, I will attend to them this week as well. Please note that dropping these face-down from 4ft onto a concrete floor will likely cause problems. Also, plugging in the power cord backwards is a sure bet to blow stuff up. Paul S.
Message
Update
2008-08-23 by Paul Schreiber
Attachments
- No local attachments were found for this message.