a) I will try to sort out the reversed cables tomorrow and will give an update whenever I hear something. I have ~ 10 assembled modules to ship Mon/Tues that I will 'borrow' correct power cables from kits previously made up. But then I will stop doing that so I'll have kits to ship out this week as well. Hopefully the new company can get me corrected cables by the end of the week. b) MOTM-190 panels arrived, MOTM-650 panels due July 20th. c) I am out of the special bi-color LED used in the MOTM-320 and will look for a replacement. Some kits will require soldering wires to the LED (the older LED has red/black wires pre-soldered). I will have to call Lumex as it looks from their website this particular LED/lens assembly is no longer offered. d) I'm still going to finish all of the kits up this week (even if I have to wait for power cables) then go back to assembled modules. The assembled backlog is still large and it will be many weeks until it gets to the < 20 level. Shane & I will be soldering for ~ 3 straight weeks this month and that will probably be a 30% overall reduction. So, it will be into August to get the backlog level substantially reduced. e) remember: if you want an order shipped "with a tracking number", you need to: 1) use EMS Express (both US and Foreign) 2) for *US ONLY* you can specify Fed-Ex Ground in the COMMENT field of the order page, the cost is the *same* as Priority Mail. For people receiving large/heavy/expensive shipments, I usually ship Fed-Ex Ground anyway. Paul S.
Message
Update
2009-07-06 by Paul Schreiber
Attachments
- No local attachments were found for this message.