Yahoo Groups archive

MOTM

Index last updated: 2026-04-28 23:35 UTC

Thread

1 down......

1 down......

2003-09-09 by Paul Schreiber

Sent the final MIDI-CV converter *prototype* pc board to the fab today. Ordered all the parts
(building up 3) and everything should be here Monday. Added RJ-45 connectors (a la Ethernet) to
allow 2 units to connect (on the rear) to make an 8-voiced converter.

Starting tomorrow on BigBertha_1, which has multiple prototype circuits on 1 8 x 10" board. There
will be a BigBertha_2 as well, but that comes *after* I do the production '480 layout AND the
uSeq prototype (redesign to include sysex load/saving). The production WaveWarper boards have
arrived, I need to have the rotary switch assembly verified and ordered (outside contractor).
Never a dull moment......sigh.....

I'm still shipping small quantities of modules, and this will continue until the end of October.
Things will pick up the first 1/2 of Nov, but them taper off as NAMM approaches.

Still searching for the magic "ship all at once" wand.......

Paul S.

Move to quarantaine

This moves the raw source file on disk only. The archive index is not changed automatically, so you still need to run a manual refresh afterward.