greetings colin, I submitted my email address for the waiting list a back in late October and never received any confirmation of being put on the list. 

can you check to see that I am on there and where I am in the overall list/time to ship? 

thanks!

ps. the email address is the one on my group account.

Re: waiting list confirmation

2011-01-04 by t_natalini

I am interested in this as well, Colin. Thanks!

--- In analogue-sequencer@yahoogroups.com, "random2393" <holografique@...> wrote:
Show quoted textHide quoted text
>
> greetings colin, I submitted my email address for the waiting list a back in late October and never received any confirmation of being put on the list. 
> 
> can you check to see that I am on there and where I am in the overall list/time to ship? 
> 
> thanks!
> 
> ps. the email address is the one on my group account.
>

Re: waiting list confirmation

2011-01-04 by musicalgeometry

Even just a rough idea of how many people are on the list and how many units are shipping and when would be really fantastic. The Cirklon just looks so great that we are all dying to get our hands on one. I'd love to know if we have weeks to wait, several months or if we are looking even longer.

--- In analogue-sequencer@yahoogroups.com, "t_natalini" <t_natalini@...> wrote:
Show quoted textHide quoted text
>
> I am interested in this as well, Colin. Thanks!
> 
> --- In analogue-sequencer@yahoogroups.com, "random2393" <holografique@> wrote:
> >
> > greetings colin, I submitted my email address for the waiting list a back in late October and never received any confirmation of being put on the list. 
> > 
> > can you check to see that I am on there and where I am in the overall list/time to ship? 
> > 
> > thanks!
> > 
> > ps. the email address is the one on my group account.
> >
>

RE: [analogue-sequencer] Re: waiting list confirmation

2011-01-05 by Ditton33

I'd recommend the web site being updated with timescales. The 'shipping
September', though still not anywhere near the Z sequencer situation, will
start to look a bit strange.

Having said that, perhaps it means September 2011. ;)
Show quoted textHide quoted text
> >-----Original Message-----
> >From: analogue-sequencer@yahoogroups.com 
> >[mailto:analogue-sequencer@yahoogroups.com] On Behalf Of 
> >musicalgeometry
> >Sent: 05 January 2011 00:34
> >To: analogue-sequencer@yahoogroups.com
> >Subject: [analogue-sequencer] Re: waiting list confirmation
> >
> >Even just a rough idea of how many people are on the list 
> >and how many units are shipping and when would be really 
> >fantastic. The Cirklon just looks so great that we are all 
> >dying to get our hands on one. I'd love to know if we have 
> >weeks to wait, several months or if we are looking even longer.
> >
> >--- In analogue-sequencer@yahoogroups.com, "t_natalini" 
> ><t_natalini@...> wrote:
> >>
> >> I am interested in this as well, Colin. Thanks!
> >> 
> >> --- In analogue-sequencer@yahoogroups.com, "random2393" 
> ><holografique@> wrote:
> >> >
> >> > greetings colin, I submitted my email address for the 
> >waiting list a back in late October and never received any 
> >confirmation of being put on the list. 
> >> > 
> >> > can you check to see that I am on there and where I am 
> >in the overall list/time to ship? 
> >> > 
> >> > thanks!
> >> > 
> >> > ps. the email address is the one on my group account.
> >> >
> >>
> >
> >
> >
> >
> >------------------------------------
> >
> >Yahoo! Groups Links
> >
> >
> >

Re: waiting list confirmation

2011-01-05 by t_natalini

Personally, I just want to know if I'm actually on the wait list as there is apparently
no means of feedback on Sequentix's end when you email the request to be put on the list. Secondly, I'd like to know If I will get a unit from the first production run as there has been mention of parts shortage.  I'm willing to pre-pay if the helps, Colin.


--- In analogue-sequencer@yahoogroups.com, "Ditton33" <ditton33@...> wrote:
Show quoted textHide quoted text
>
> I'd recommend the web site being updated with timescales. The 'shipping
> September', though still not anywhere near the Z sequencer situation, will
> start to look a bit strange.
> 
> Having said that, perhaps it means September 2011. ;)
> 
> >

Re: [analogue-sequencer] Re: waiting list confirmation

2011-01-05 by watson

what is the "z sequencer"?

On Wed, Jan 5, 2011 at 3:59 AM, t_natalini <t_natalini@yahoo.com> wrote:

>
>
> Personally, I just want to know if I'm actually on the wait list as there
> is apparently
> no means of feedback on Sequentix's end when you email the request to be
> put on the list. Secondly, I'd like to know If I will get a unit from the
> first production run as there has been mention of parts shortage. I'm
> willing to pre-pay if the helps, Colin.
>
>
> --- In analogue-sequencer@yahoogroups.com<analogue-sequencer%40yahoogroups.com>,
> "Ditton33" <ditton33@...> wrote:
> >
> > I'd recommend the web site being updated with timescales. The 'shipping
> > September', though still not anywhere near the Z sequencer situation,
> will
> > start to look a bit strange.
> >
> > Having said that, perhaps it means September 2011. ;)
> >
> > >
>
>  
>


[Non-text portions of this message have been removed]

RE: [analogue-sequencer] Re: waiting list confirmation

2011-01-05 by Colin Fraser

> I'd recommend the web site being updated with timescales. The 
> 'shipping September', though still not anywhere near the Z 
> sequencer situation, will start to look a bit strange.

Apologies for the continuing delay.
I have updated the web page now.
The first batch of production enclosures was 50 units, and those arrived in
late September.
To coincide with their arrival, I ordered all required stock of other parts
to assemble the full run.
The plan was to assemble the first 10 units by hand to document the assembly
process, then have the rest of the run factory assembled.
The supplier of the encoder knobs (of which 950 were needed) only came up
with 100 or so, and a lead-time for the remainder of 'early December'.
Another small quantity of knobs has arrived since, but the lead time for the
rest has now slipped to later this month, with more to follow next month.
I have been in contact with the Taiwanese maker of the knobs directly, and
had samples of an almost-identical part available from stock, but the were
just slightly to loose to stay on the encoder shafts.
They offered to do a run of the correct part for me on a 6-week lead time
(and an extra tooling fee), but at that point, it looked like Farnell were
going to have them sooner.

So the present situation is that I have enough knobs to assemble a further 6
units, which can ship this month.
I'll be in contact with those at the top of the waiting list as they become
ready.
As soon as the knob supply problem is resolved, the ETA for the rest of the
first run should become clear.
I'm not keen on taking pre-payment or deposits, but it could speed up the
delivery timescale if I did.
I want to get a bit more video uploaded first, so that people can be clear
just what they're getting.

Best regards,
Colin Fraser
Sequentix Music Systems Ltd
http://www.sequentix.com

Re: [analogue-sequencer] Re: waiting list confirmation

2011-01-05 by watson

i cant wait to see the videos, i wont be able to buy one of these for a few
months so the videos will definitely be a nice teaser until then. thanks
colin.

On Wed, Jan 5, 2011 at 7:09 AM, Colin Fraser <colin@sequentix.com> wrote:

>
>
>
> > I'd recommend the web site being updated with timescales. The
> > 'shipping September', though still not anywhere near the Z
> > sequencer situation, will start to look a bit strange.
>
> Apologies for the continuing delay.
> I have updated the web page now.
> The first batch of production enclosures was 50 units, and those arrived in
> late September.
> To coincide with their arrival, I ordered all required stock of other parts
> to assemble the full run.
> The plan was to assemble the first 10 units by hand to document the
> assembly
> process, then have the rest of the run factory assembled.
> The supplier of the encoder knobs (of which 950 were needed) only came up
> with 100 or so, and a lead-time for the remainder of 'early December'.
> Another small quantity of knobs has arrived since, but the lead time for
> the
> rest has now slipped to later this month, with more to follow next month.
> I have been in contact with the Taiwanese maker of the knobs directly, and
> had samples of an almost-identical part available from stock, but the were
> just slightly to loose to stay on the encoder shafts.
> They offered to do a run of the correct part for me on a 6-week lead time
> (and an extra tooling fee), but at that point, it looked like Farnell were
> going to have them sooner.
>
> So the present situation is that I have enough knobs to assemble a further
> 6
> units, which can ship this month.
> I'll be in contact with those at the top of the waiting list as they become
> ready.
> As soon as the knob supply problem is resolved, the ETA for the rest of the
> first run should become clear.
> I'm not keen on taking pre-payment or deposits, but it could speed up the
> delivery timescale if I did.
> I want to get a bit more video uploaded first, so that people can be clear
> just what they're getting.
>
> Best regards,
> Colin Fraser
> Sequentix Music Systems Ltd
> http://www.sequentix.com
>
>  
>


[Non-text portions of this message have been removed]

RE: [analogue-sequencer] Re: waiting list confirmation

2011-01-05 by Ditton33

Thanks for the update Colin.

Just noticed price sub 1000 ex VAT. 

20% ouch. :)
Show quoted textHide quoted text
> >-----Original Message-----
> >From: analogue-sequencer@yahoogroups.com 
> >[mailto:analogue-sequencer@yahoogroups.com] On Behalf Of Colin Fraser
> >Sent: 05 January 2011 12:10
> >To: analogue-sequencer@yahoogroups.com
> >Subject: RE: [analogue-sequencer] Re: waiting list confirmation
> >
> >
> >> I'd recommend the web site being updated with timescales. The 
> >> 'shipping September', though still not anywhere near the Z 
> >sequencer 
> >> situation, will start to look a bit strange.
> >
> >Apologies for the continuing delay.
> >I have updated the web page now.
> >The first batch of production enclosures was 50 units, and 
> >those arrived in late September.
> >To coincide with their arrival, I ordered all required stock 
> >of other parts to assemble the full run.
> >The plan was to assemble the first 10 units by hand to 
> >document the assembly process, then have the rest of the run 
> >factory assembled.
> >The supplier of the encoder knobs (of which 950 were needed) 
> >only came up with 100 or so, and a lead-time for the 
> >remainder of 'early December'.
> >Another small quantity of knobs has arrived since, but the 
> >lead time for the rest has now slipped to later this month, 
> >with more to follow next month.
> >I have been in contact with the Taiwanese maker of the knobs 
> >directly, and had samples of an almost-identical part 
> >available from stock, but the were just slightly to loose to 
> >stay on the encoder shafts.
> >They offered to do a run of the correct part for me on a 
> >6-week lead time (and an extra tooling fee), but at that 
> >point, it looked like Farnell were going to have them sooner.
> >
> >So the present situation is that I have enough knobs to 
> >assemble a further 6 units, which can ship this month.
> >I'll be in contact with those at the top of the waiting list 
> >as they become ready.
> >As soon as the knob supply problem is resolved, the ETA for 
> >the rest of the first run should become clear.
> >I'm not keen on taking pre-payment or deposits, but it could 
> >speed up the delivery timescale if I did.
> >I want to get a bit more video uploaded first, so that 
> >people can be clear just what they're getting.
> >
> >Best regards,
> >Colin Fraser
> >Sequentix Music Systems Ltd
> >http://www.sequentix.com
> >
> >
> >
> >
> >------------------------------------
> >
> >Yahoo! Groups Links
> >
> >
> >

Re: waiting list confirmation

2011-01-07 by duncan

>>what is the "z sequencer"?<<

another analogue sequencer that some of us had to wait a long TIME for.

(einen anderen sequenzer.....)

:-)

you want to buy mine?

RE: [analogue-sequencer] Re: waiting list/payment due

2011-01-19 by Sound Engineer

Hi there Colin & Sequentix fans & a belated Happy New Year to you all.

In light of some recent posts re. due date for the Cirklons, can you tell me what the timescale is on making payment once a unit is ready & my place on the waiting is reached?

As usual Jan/Feb are going to be tight months & so will now need to sell some more other kit to fund my Cirklon purchase, having spent previously raised funds up to & over Xmas...
I'm keen to not miss out on a Cirklon though of course, so would be good to know of the deadline for payment once notified of a ready unit.

Cheers,
Kev.
 

> >

> >So the present situation is that I have enough knobs to 

> >assemble a further 6 units, which can ship this month.

> >I'll be in contact with those at the top of the waiting list 

> >as they become ready.

> >As soon as the knob supply problem is resolved, the ETA for 

> >the rest of the first run should become clear.

> >I'm not keen on taking pre-payment or deposits, but it could 

> >speed up the delivery timescale if I did.

> >I want to get a bit more video uploaded first, so that 

> >people can be clear just what they're getting.

> >

> >Best regards,

> >Colin Fraser

> >Sequentix Music Systems Ltd

> >http://www.sequentix.com

> >

> >

> >

> >

> >------------------------------------

> >

> >Yahoo! Groups Links

> >

> >

> >





    
     

    
    


 



  






      

[Non-text portions of this message have been removed]

RE: [analogue-sequencer] CHK FAIL = 2681

2011-01-30 by Colin Fraser

Hi Tom, 

> At first all was OK, but than it went all crazy.
> I turned it off, rebooted, only to receive a CHK FAIL = 2681 (BOOT -
> FLASH) message.
> 
> So what does this mean?

It means the boot-time checksum calculated from the main program is
incorrect - one or more bytes in the flash ROM must have become corrupt.
So long as the bootloader code is unaffected, re-loading the OS by sysex
should fix it.
If the bootloader is affected (not very likely), I can usually erase the
whole chip and re-flash it.
That would mean brief holiday for your CPU in Scotland.

Best regards,
Colin Fraser
Sequentix Music Systems Ltd
http://www.sequentix.com

CHK FAIL = 2681

2011-01-30 by toad

Hello All,

Just got back from China. So after more than 3 weeks I powered on my P3.
At first all was OK, but than it went all crazy.
I turned it off, rebooted, only to receive a CHK FAIL = 2681 (BOOT - 
FLASH) message.

So what does this mean?

Cheers,
Tom

Re: [analogue-sequencer] CHK FAIL = 2681

2011-01-31 by Tom Adam

Yes, this seems to have done the trick. It's been happily running for a 
couple of hours.
What could have caused this flash rom corruption?

(is there a .mid for v4.5 somewhere? Or what tool is there for linux to 
send a sysex file? I've used kmidimon to upload the 4.0 mid version.)

Cheers,
Tom


  Op 30-1-2011 14:21, Colin Fraser schreef:
>
> Hi Tom,
>
> > At first all was OK, but than it went all crazy.
> > I turned it off, rebooted, only to receive a CHK FAIL = 2681 (BOOT -
> > FLASH) message.
> >
> > So what does this mean?
>
> It means the boot-time checksum calculated from the main program is
> incorrect - one or more bytes in the flash ROM must have become corrupt.
> So long as the bootloader code is unaffected, re-loading the OS by sysex
> should fix it.
> If the bootloader is affected (not very likely), I can usually erase the
> whole chip and re-flash it.
> That would mean brief holiday for your CPU in Scotland.
>
> Best regards,
> Colin Fraser
> Sequentix Music Systems Ltd
> http://www.sequentix.com
>
> 



[Non-text portions of this message have been removed]

RE: [analogue-sequencer] CHK FAIL = 2681

2011-01-31 by Colin f

> Yes, this seems to have done the trick. It's been happily 
> running for a couple of hours.
> What could have caused this flash rom corruption?

It seems to happen very occasionally - not often enough to come to any
conclusions about possible causes.
The rate it happens at doesn't seem to have increased even though the CPUs
are all 5 years old at least.
One of these days, I'll investigate other CPU types as spares for P3.
The original CPU seems impossible to find in DIP, but it is available is
SMD.
There are other makers parts that might do the job too.
It would be nice to have a bit of backup - I only have a handful of used
spare CPUs.
 
> (is there a .mid for v4.5 somewhere? Or what tool is there 
> for linux to send a sysex file? I've used kmidimon to upload 
> the 4.0 mid version.)

It's on the download page at the Sequentix site:
http://www.sequentix.com/sq_download.htm

Cheers,
Colin

RE: [analogue-sequencer] CHK FAIL = 2681

2011-01-31 by Colin Fraser

> No it's not. I only see a sysex file there for version 4.5. 
> Or am I missing something?

Ah...
Try this:
http://www.sequentix.com/files/p3v4.5b2.mid


Best regards,
Colin Fraser
Sequentix Music Systems Ltd
http://www.sequentix.com

Re: [analogue-sequencer] CHK FAIL = 2681

2011-01-31 by Tom Adam

>
> > (is there a .mid for v4.5 somewhere? Or what tool is there
> > for linux to send a sysex file? I've used kmidimon to upload
> > the 4.0 mid version.)
>
> It's on the download page at the Sequentix site:
> http://www.sequentix.com/sq_download.htm
>
No it's not. I only see a sysex file there for version 4.5. Or am I 
missing something?

Cheers,
Tom


[Non-text portions of this message have been removed]

Re: [analogue-sequencer] CHK FAIL = 2681

2011-02-01 by Tom Adam

Thanks Colin!
I'll give it a try tonight.

Cheers,
ToAd
Op 31-1-2011 14:40, Colin Fraser schreef:
>
>
> > No it's not. I only see a sysex file there for version 4.5.
> > Or am I missing something?
>
> Ah...
> Try this:
> http://www.sequentix.com/files/p3v4.5b2.mid
>
> Best regards,
> Colin Fraser
> Sequentix Music Systems Ltd
> http://www.sequentix.com
>
> 



[Non-text portions of this message have been removed]

Move to quarantaine

This moves the raw source file on disk only. The archive index is not changed automatically, so you still need to run a manual refresh afterward.